Reserves Increase by 207,000 Ounces at Young-Davidson Underground
Company-Wide Reserves and M&I Resources Increase by 15% to 10.4 Million
Gold Ounces
TORONTO, Feb. 19, 2015 /CNW/ - AuRico Gold Inc. (TSX: AUQ) (NYSE: AUQ), ("AuRico" or the "Company") today reported its updated Reserves and
Resources, as at December 31, 2014. (Detailed Mineral Reserve and Resource tables can be found at the end of
this press release).
Mineral Reserves and Resources
Reserve Highlights
As at December 31, 2014, the Company is reporting:
-
Reserves at the Young-Davidson underground mine increased by 207,000
ounces, or 6%, over 2013, as the Company was successful in replacing
production and increasing reserves.
-
Reserves decreased by 37% at the El Chanate mine, due to both mining
depletion and a reduction in overall slope angles, while reserve grades
increased by 5%. The reduction in planned slope angles came after a
thorough external geotechnical review of geotechnical drilling, mapping
and slope performance.
Gold Reserves by asset are summarized in the table below:
|
|
|
Proven and Probable Mineral Reserves1
|
|
|
Gold ounces (000's)
|
Gold grade (g/t)
|
|
31-Dec-14
|
2014
|
2013
|
Change (%)
|
2014
|
2013
|
Change (%)
|
|
|
Young-Davidson Underground
|
3,763
|
3,556
|
6%
|
2.74
|
2.81
|
(3%)
|
|
|
Young-Davidson Surface
|
61
|
140
|
(57%)
|
0.76
|
1.10
|
(31%)
|
|
Total Young-Davidson
|
3,823
|
3,696
|
3%
|
2.63
|
2.66
|
(1%)
|
|
Total El Chanate
|
646
|
1,023
|
(37%)
|
0.74
|
0.70
|
5%
|
|
Kemess Underground
|
1,805
|
1,805
|
0%
|
0.56
|
0.56
|
0%
|
|
AuRico Total
|
6,274
|
6,524
|
(4%)
|
1.13
|
1.07
|
6%
|
|
1. Detailed Mineral Reserve and Mineral Resource tables follow at the end
of this press release.
|
In addition to gold reserves, the Company is also reporting copper
reserves of:
-
619 million pounds at the Kemess Underground Project at a reserve grade
of 0.28%, using a copper price of $3.00 per pound.
"We remain encouraged with the quality of the underground reserve base
reported from our cornerstone Young-Davidson mine, which has increased
over the prior year with a consistent grade profile. This robust ore
body is comprised of low cost, long life, high margin ounces and this
asset is positioned for a long and profitable mine life." stated
Scott
Perry
, President and Chief Executive Officer. He continued,
"Company-wide, we are also reporting a significant increase in our
resource base in Canada as a result of our successful drilling program
at Kemess East, as well as through our strategic joint venture on the
promising Lynn Lake Project."
Resource Highlights
As at December 31, 2014 the Company is also reporting the following
Mineral Resources, which are in addition to reserves:
-
Measured and Indicated gold resources of 4.1 million gold ounces at a
grade of 0.84 g/t, an increase of 1.6 million ounces, or 64%, primarily
related to additional resources from the Kemess East and Lynn Lake
Projects; and
-
Inferred gold resources of 2.4 million gold ouncesat a grade of 0.52
g/t, an increase of 1.9 million ounces, or 409%, primarily related to
additional inferred resources from the Kemess East and Lynn Lake
Projects.
Gold mineral resources as at December 31, 2014 by asset are summarized
in the table below:
|
|
|
Gold Resources (in thousands of gold ounces)1
|
|
|
Measured & Indicated
|
|
Inferred
|
|
December 31, 2014
|
2014
|
|
2013
|
|
2014
|
|
2013
|
|
|
Young-Davidson Underground
|
1,430
|
|
1,484
|
|
320
|
|
323
|
|
|
Young-Davidson Surface
|
69
|
|
32
|
|
1
|
|
1
|
|
Young-Davidson Total
|
1,499
|
|
1,516
|
|
321
|
|
324
|
|
El Chanate Total
|
69
|
|
49
|
|
2
|
|
14
|
|
|
Kemess Underground
|
854
|
|
854
|
|
125
|
|
125
|
|
|
Kemess East
|
939
|
|
-
|
|
1,424
|
|
-
|
|
Kemess Property Total
|
1,793
|
|
854
|
|
1,549
|
|
125
|
|
Lynn Lake Total (25%)
|
657
|
|
-
|
|
522
|
|
-
|
|
Orion Total (50%)
|
65
|
|
65
|
|
10
|
|
10
|
|
AuRico Total
|
4,083
|
|
2,484
|
|
2,404
|
|
472
|
The Company is also reporting by-product mineral resources:
-
Indicated by-product resources including:
-
346 million pounds of copper from the Kemess Underground Project at a
grade of 0.24%; and
-
504 million pounds of copper from the Kemess East Project at a grade of
0.41%.
-
Inferred by-product resources including:
-
46 million pounds of copper from the Kemess Underground Project at a
grade of 0.21%; and
-
871 million pounds of copper from the Kemess East Project at a grade of
0.34%.
Chris Bostwick
, Senior Vice President, Technical Services for AuRico
Gold Inc. has reviewed the scientific and technical information
contained within this press release and serves as the Qualified Person
as defined by National Instrument 43-101.
Reserves and Resources (as of December 31, 2014)
|
|
|
Mineral Reserve Estimates - Gold
|
|
|
|
|
Tonnes
|
Grade
|
Ounces
|
|
|
|
Category
|
(000's)
|
(g/t)
|
(000's)
|
|
Young-Davidson
|
Surface
|
Proven
|
2,501
|
0.76
|
61
|
|
|
Probable
|
-
|
-
|
-
|
|
|
P&P
|
2,501
|
0.76
|
61
|
|
Underground
|
Proven
|
12,499
|
2.83
|
1,137
|
|
|
Probable
|
30,274
|
2.70
|
2,626
|
|
|
P&P
|
42,773
|
2.74
|
3,763
|
|
Total Young-Davidson
|
P&P
|
45,273
|
2.63
|
3,823
|
|
El Chanate
|
|
Proven
|
18,255
|
0.80
|
472
|
|
|
Probable
|
8,958
|
0.60
|
174
|
|
Total El Chanate
|
P&P
|
27,213
|
0.74
|
646
|
|
Kemess Underground
|
|
Proven
|
-
|
-
|
-
|
|
|
Probable
|
100,373
|
0.56
|
1,805
|
|
Total Kemess
|
P&P
|
100,373
|
0.56
|
1,805
|
|
AuRico Total
|
P&P
|
172,860
|
1.13
|
6,274
|
|
|
|
|
|
|
|
Mineral Resource Estimates - Gold
|
|
|
Category
|
Tonnes
|
Grade
|
Ounces
|
|
|
(000's)
|
(g/t)
|
(000's)
|
|
Young-Davidson
|
Surface
|
Measured
|
496
|
1.13
|
18
|
|
Indicated
|
1,242
|
1.28
|
51
|
|
M&I
|
1,739
|
1.24
|
69
|
|
Underground
|
Measured
|
7,855
|
3.28
|
829
|
|
Indicated
|
6,090
|
3.07
|
601
|
|
M&I
|
13,946
|
3.19
|
1,430
|
|
Total Young-Davidson
|
M&I
|
15,684
|
2.97
|
1,499
|
|
Surface
|
Inferred
|
31
|
0.99
|
1
|
|
Underground
|
Inferred
|
3,608
|
2.76
|
320
|
|
Total Young-Davidson
|
Inferred
|
3,639
|
2.75
|
321
|
|
El Chanate
|
|
Measured
|
923
|
0.58
|
17
|
|
|
Indicated
|
1,842
|
0.87
|
52
|
|
Total El Chanate
|
M&I
|
2,764
|
0.77
|
69
|
|
Inferred
|
184
|
0.38
|
2
|
|
Kemess Underground
|
|
Measured
|
-
|
-
|
-
|
|
|
Indicated
|
65,432
|
0.41
|
854
|
|
Total Kemess Underground
|
M&I
|
65,432
|
0.41
|
854
|
|
Inferred
|
9,969
|
0.39
|
125
|
|
Kemess East
|
|
Measured
|
-
|
-
|
-
|
|
|
Indicated
|
55,864
|
0.52
|
939
|
|
Total Kemess East
|
M&I
|
55,864
|
0.52
|
939
|
|
Inferred
|
117,152
|
0.38
|
1,424
|
|
Lynn Lake (25%)
|
MacLellan
|
Measured
|
3,753
|
1.99
|
240
|
|
Indicated
|
4,344
|
1.75
|
244
|
|
M&I
|
8,096
|
1.86
|
484
|
|
Inferred
|
475
|
2.01
|
31
|
|
Farley Lake
|
Measured
|
-
|
-
|
-
|
|
Indicated
|
1,479
|
3.21
|
153
|
|
M&I
|
1,479
|
3.21
|
153
|
|
Inferred
|
1,091
|
2.87
|
101
|
|
Burnt Timber
|
Measured
|
-
|
-
|
-
|
|
Indicated
|
255
|
1.40
|
11
|
|
M&I
|
255
|
1.40
|
11
|
|
Inferred
|
5,860
|
1.04
|
195
|
|
Linkwood
|
Measured
|
-
|
-
|
-
|
|
Indicated
|
246
|
1.16
|
9
|
|
M&I
|
246
|
1.16
|
9
|
|
Inferred
|
5,251
|
1.16
|
196
|
|
Total Lynn Lake
|
M&I
|
10,076
|
2.03
|
657
|
|
Inferred
|
12,676
|
1.28
|
522
|
|
Orion (50%)
|
|
Measured
|
-
|
-
|
-
|
|
|
Indicated
|
554
|
3.66
|
65
|
|
Total Orion
|
M&I
|
554
|
3.65
|
65
|
|
Inferred
|
91
|
3.33
|
10
|
|
AuRico Total
|
|
M&I
|
150,373
|
0.84
|
4,083
|
|
|
Inferred
|
143,711
|
0.52
|
2,404
|
|
|
|
Mineral Reserve and Resource Estimates - Copper and Silver
|
|
|
|
Grade
|
Contained Metal
|
|
|
|
Tonnes
|
Cu
|
Ag
|
Cu
|
Ag
|
|
|
Category
|
(000's)
|
(%)
|
(g/t)
|
(000's) lbs
|
(000's) oz
|
|
Kemess Underground
|
Probable Reserves
|
100,373
|
0.28
|
2.0
|
619,151
|
6,608
|
|
Indicated Resources
|
65,432
|
0.24
|
1.8
|
346,546
|
3,811
|
|
Inferred Resources
|
9,969
|
0.21
|
1.6
|
46,101
|
503
|
|
Kemess East
|
Indicated Resources
|
55,864
|
0.41
|
2.0
|
503,663
|
3,601
|
|
Inferred Resources
|
117,152
|
0.34
|
1.8
|
871,407
|
6,739
|
|
Orion (50%)
|
Indicated Resources
|
554
|
-
|
309
|
-
|
5,503
|
|
Inferred Resources
|
91
|
-
|
95
|
-
|
275
|
Notes to Mineral Reserve and Resource tables:
-
Mineral Reserves and Resources have been stated as at December 31, 2014.
-
Mineral Resources are exclusive of Mineral Reserves. Mineral Resources
that are not Mineral Reserves do not have demonstrated economic
viability.
-
El Chanate and Young-Davidson assumed a gold price of $1,250 per ounce
for reserves and $1,450 per ounce for resources.
-
Kemess Underground assumed a gold price of $1,300 per ounce, a silver
price of $23.00 per ounce, and a copper price of $3.00 per pound for
reserves. Kemess Underground assumed a $13.00 NSR cutoff for resources.
Kemess East assumed a $15.00 NSR cutoff for resources.
-
Lynn Lake assumed a gold price of $1,555 per ounce for resources.
-
Orion assumed a gold price of $850 per ounce and a silver price of
$13.00 per ounce for resources.
-
Mineral Reserves assume the following cutoff grades and process
recoveries:
-
Young-Davidson
- Surface: 0.50 gpt cutoff, 91% mill recovery
-
Young-Davidson - Underground: 1.90 gpt cutoff, 91% mill recovery
-
El Chanate: 0.15 gpt cutoff, 30%-65% leach recovery
-
Kemess Underground: $15 NSR cutoff, mill recovery of 72% for gold and
91% for copper
-
Mineral Resources and Mineral Reserves have been classified in
accordance with Canadian Institute of Mining, Metallurgy and Petroleum
("CIM") "CIM Definition Standards - For Mineral Resources and Mineral
Reserves" adopted by the CIM Council in accordance with the
requirements of National Instrument 43-101 Standards of Disclosure for
Mineral Projects ("NI 43-101"), as is required by Canadian securities
regulatory authorities. In addition, while the terms "Measured",
"Indicated and "Inferred" Mineral Resources are required pursuant to NI
43-101, the SEC does not recognize such terms. Canadian standards
differ significantly from the requirements of the SEC, and mineral
resource information contained herein is not comparable to similar
information regarding mineral reserves disclosed in accordance with the
requirements of the SEC. Investors should understand that "Inferred"
Mineral Resources have a great amount of uncertainty as to their
existence and great uncertainty as to their economic and legal
feasibility. In addition, investors are cautioned not to assume that
any part or all of AuRico's Mineral Resources constitute or will be
converted into Reserves.
-
Orion Mineral Resources are reflected on a 50% basis. Following the
completion of a joint venture agreement, Minera Frisco, S.A.B. de C.V.
has a 50% interest in the Orion project.
-
Lynn Lake Mineral Resources are reflected on a 25% basis. AuRico
acquired a 25% interest in the Lynn Lake properties in November 2014.
-
Mineral Reserve and Resource tonnage and contained metal have been
rounded to reflect the accuracy of the estimate, and numbers may not
add due to rounding.
-
The Company's normal data verification procedures have been used in
collecting, compiling, interpreting and processing the data used to
estimate mineral reserves and mineral resources and data underlying the
information, opinion and outlook contained herein. Independent data
verification has not been performed.
-
Mineral Resources were prepared under the supervision and review of
Jeffrey Volk
, CPG, FAusIMM, the Director of Reserves and Resources, for
AuRico Gold Inc. Mineral Reserves were prepared under the supervision
and review of
Chris Bostwick
, FAusIMM, the Senior Vice President
Technical Services, for AuRico Gold Inc. Both Messrs Volk and Bostwick
are "Qualified Persons" as defined by National Instrument 43-101.
About AuRico Gold
AuRico Gold is a leading Canadian gold producer with mines and projects
in North America that have significant production growth and
exploration potential. The Company is focused on its core operations
including the cornerstone Young-Davidson gold mine in northern Ontario,
and the El Chanate mine in Sonora State, Mexico. AuRico's project
pipeline also includes the advanced development Kemess Property in
northern British Columbia and the Lynn Lake Gold Camp in northern
Manitoba. The Company also has other exploration opportunities in
Canada and Mexico. AuRico's head office is located in Toronto, Ontario,
Canada.
Cautionary Statement
This press release contains forward-looking statements and
forward-looking information as defined under Canadian and U.S.
securities laws. All statements, other than statements of historical
fact, are forward-looking statements. The words "expect", "believe",
"anticipate", "will", "intend", "estimate", "forecast", "budget" and
similar expressions identify forward-looking statements.
Forward-looking statements include information as to strategy, plans or
future financial or operating performance, such as the Company's
expansion plans, project timelines, production plans, projected cash
flows or capital expenditures, cost estimates, projected exploration
results, reserve and resource estimates and other statements that
express management's expectations or estimates of future performance.
Forward-looking statements are necessarily based upon a number of
factors and assumptions that, while considered reasonable by
management, are inherently subject to significant uncertainties and
contingencies. Known and unknown factors could cause actual results to
differ materially from those projected in the forward-looking
statements, including: uncertainty of production and cost estimates;
fluctuations in the price of gold and foreign exchange rates; the
uncertainty of replacing depleted reserves; the risk that mining
operations do not meet expectations; the risk that projects will not be
developed accordingly to budgets or timelines, changes in laws in
Canada, Mexico and other jurisdictions in which the Company may carry
on business; risks of obtaining necessary licenses, permits or
approvals for operations or projects; disputes over title to
properties; the speculative nature of mineral exploration and
development; risks related to aboriginal title claims; compliance risks
with respect to current and future environmental regulations;
disruptions affecting operations; opportunities that may be pursued by
the Company; employee relations; availability and costs of mining
inputs and labor; the ability to secure capital to execute business
plans; volatility of the Company's share price; continuation of the
dividend and dividend reinvestment plan; the effect of future
financings; litigation; risk of loss due to sabotage and civil
disturbances; the values of assets and liabilities based on projected
future cash flows; risks arising from derivative instruments or the
absence of hedging; adequacy of internal control over financial
reporting; changes in credit rating; and the impact of inflation.
Actual results and developments are likely to differ, and may differ
materially, from those expressed or implied by the forward-looking
statements contained herein. Such statements are based on a number of
assumptions which may prove to be incorrect, including assumptions
about: business and economic conditions; commodity prices and the price
of key inputs such as labour, fuel and electricity; credit market
conditions and conditions in financial markets generally; revenue and
cash flow estimates, production levels, development schedules and the
associated costs; ability to procure equipment and supplies and on a
timely basis; the timing of the receipt of permits and other approvals
for projects and operations; the ability to attract and retain skilled
employees and contractors for the operations; the accuracy of reserve
and resource estimates; the impact of changes in currency exchange
rates on costs and results; interest rates; taxation; and ongoing
relations with employees and business partners. The Company disclaims
any intention or obligation to update or revise any forward-looking
statements whether as a result of new information, future events or
otherwise, except as required by applicable law.
Cautionary Note to U.S. Investors Concerning Measured, Indicated and
Inferred Resources
This press release uses the terms "measured," "indicated" and "inferred"
resources. We advise investors that while those terms are recognized
and required by Canadian regulations, the United States Securities and
Exchange Commission does not recognize them. "Inferred" resources"
have a great amount of uncertainty as to their existence and as to
their economic and legal feasibility. It cannot be assumed that all or
any part of an inferred resource will ever be upgraded to a higher
category. Under Canadian rules, estimates of inferred mineral
resources may not form the basis of feasibility or other economic
studies. United States investors are cautioned not to assume that all
or any part of measured or indicated mineral resources will ever be
converted into mineral reserves. United States investors are also
cautioned not to assume that all or any part of an inferred mineral
resource exists, or is economically or legally mineable.
SOURCE AuRico Gold Inc.